| 504977 | CV1 Sample Point Valve snapped. | 0 days | |
| 504976 | (!) Chlorous leak (dosing system panel by WCWW) | 2 days | |
| 504975 | Install hand soap dispenser | 2 days | |
| 504963 | Remove un-used flow meter on the separation line (~cv3) & replace with spool | 3 days | |
| 504959 | Separation Line - Steam Trap (Located ~FV6) - Routine 6-Weekly Overhaul (PPM) | 3 days | |
| 504956 | LYV7 Temperature Probe - Routine 12-Monthly Calibration (PPM) | 3 days | |
| 504950 | Chilled Water System - Routine Weekly Differential Pressure Inspection (PPM) | 3 days | |
| 504948 | MED Canteen - Insectocutor Required | 3 days | |
| 504943 | Sep line leaking under LYV13 - above Caudeta/Perbac sully lines (corner by the wall) | 4 days | |
| 504910 | Perished FV3 vacuum breaker gasket (location: FV top platform) | 8 days | |
| 504908 | (!) 10% minimum valve output needed for SEPPC328 & SEPPC330 during sterilising | 9 days | |
| 504885 | LYV7 - level sensor readings are not stable | 10 days | |
| 504879 | Sterilised molasses leaking from the flange (high level, behind FV5) | 10 days | |
| 504869 | Check instrumentation wiring for Molasses Tank 6 | 11 days | |
| 504827 | SCADA comms lost multiple times (10.64.23.115 - comms.5). Time range 12:15-12:40. | 17 days |